Broker_uClock

Broker uClock

Minimalistic date/time display for Broker with optional hourly chime.

Builder Version Tracker


The Quick Intro

Broker uClock is the spiritual successor to my old FuBar uClock, which itself was a re-write of FuBar ClockFu, re-written from the ground up using Ace-3.0 and LibDataBroker-1.1.

  • Shows realm time, local time, or UTC time in the data feed (or all three!).
  • Shows today's date aswell as realm time, local time, and UTC time in the tooltip.
  • Toggles the in-game Time Manager (stop watch, alarm clock, etc.) if clicked.
  • Toggles GroupCalendar (if installed) or the in-game calendar if shift-clicked.

As uClock is written to utilise LibDataBroker, you must also install a "broker display" addon in order for this addon to work.

Configuration

Options can be found in the config window accessed by right-clicking the plugin.

  • Choose to have a chime play at the start of a new hour. The sound file can be configured or turned off completely.
  • Choose which time formats you want shown in the data feed, and what order they appear in.
  • Choose whether to show seconds or hide them.
  • Choose whether to have the time shown in 12-hour or 24-hour format.

Support

Twitter Twooter Discord

Twitch GitHub PayPal Coffee

About This Project

  • Project ID
    17745
  • Created
    Feb 13, 2009
  • Last Released File
    Jun 11, 2021
  • Total Downloads
    198,460
  • License

Categories

Members

Recent Files

WoW Retail